location_on SALTA PROVINCE, ARGENTINA

Puna Leach Mine

A steady, low-cost open-pit heap leach operation providing reliable, consistent gold production in a favorable Latin American mining jurisdiction.

PRIMARY METAL Gold (Au)
MINING METHOD Open Pit
OWNERSHIP 100%

Open-Pit Excellence

Situated in the high Andes of Salta Province, Argentina, Puna is a low-cost open-pit operation that recovers gold through heap leaching.

Through practical metallurgy and disciplined cost control, Puna delivers reliable, consistent margins, serving as a steady cornerstone of our Latin American portfolio.

110k–125k 2026 GUIDANCE (GEO)
$1,250–$1,380/oz TARGET AISC
Puna Leach Mine
travel_explore

Deposit Geology

Mineralization at Puna occurs within an oxidized epithermal system, well-suited to efficient open-pit mining and heap-leach recovery.

Our 2026 exploration program focuses on extending the known mineralized zones, aiming to rapidly replace mined depletion and extend the overall mine life.

factory

Heap Leach Processing

Run-of-mine ore is crushed and stacked on lined leach pads, with gold recovered through a modern ADR (Adsorption-Desorption-Recovery) circuit.

This process yields marketable doré bars at a low unit cost, while minimizing its environmental footprint.

Reserves & Resources

CATEGORY TONNAGE (Mt) GRADE (g/t AgEq) Contained (Moz)
Proven & Probable Reserves 62.0 0.60 g/t 1.20
Measured & Indicated Resources 90.0 0.58 g/t 1.68
Inferred Resources 35.0 0.55 g/t 0.62

Notes: Mineral Resources are inclusive of Mineral Reserves. Grades are expressed in Silver Equivalent (AgEq) factoring in Gold credits. Effective date: December 31, 2025. Standard: NI 43-101.

Learn More About Our Operations

Discover how we are transforming the mining industry through innovation and responsible management.

Contact Us